Improvement Plays

Focused, standalone improvement plays teams can run independently or as part of a larger CD migration.

    Each play targets a common delivery challenge. You can run any play in isolation or stack several as part of a broader improvement push. Most take one sprint or less to get the first results.

    Baseline Your Delivery Metrics

    What: Capture two sets of numbers before making any other changes: CI health metrics (integration frequency, build success rate, time to fix a broken build) and the four DORA metrics (deployment frequency, lead time for changes, change failure rate, mean time to restore).

    Why: CI health metrics are leading indicators - they move immediately when team behaviors change and surface problems while they are still small. DORA metrics are lagging outcomes - they confirm that improvement is compounding into better delivery performance. You need both.

    How to measure success: You have numbers for all seven metrics written down and dated. The team tracks CI health metrics weekly to drive improvement experiments. DORA metrics are reviewed monthly to confirm progress.

    Resources: Baseline Metrics - Metrics-Driven Improvement - DORA Metrics Reference


    Run a Story Slicing Workshop

    What: In one sprint planning session, take every story estimated at more than 2 days and break it into vertical slices that each deliver testable behavior. Do not start any story that fails this check.

    Why: Large stories are the hidden root cause of delayed integration, painful code reviews, and long lead times. A team that cannot slice stories cannot do CD. This is the foundational skill.

    How to measure success: Average story cycle time drops below 2 days within two sprints. Work in progress count decreases.

    Resources: Work Decomposition - Monolithic Work Items - Horizontal Slicing


    Stop the Line on a Broken Pipeline

    What: For one sprint, enforce a team rule: nothing moves forward when the pipeline is red. The whole team stops and fixes it before picking up new work.

    Why: A pipeline that is sometimes broken is untrustworthy. Teams learn to ignore failures, which means they learn to ignore feedback. A consistently green pipeline is the foundation CD depends on.

    How to measure success: Pipeline failure time (time the pipeline spends red) drops to near zero. Time-to-fix when failures do occur shortens to under 10 minutes.

    Resources: Flaky Tests - Slow Pipelines - Deterministic Pipeline


    Delete Your Long-Lived Branches

    What: Identify every branch that has been open for more than 3 days. Merge or delete each one this week. Going forward, set a team rule that no branch lives longer than one day before integrating to trunk.

    Why: Long-lived branches are integration debt. Every day a branch stays open, merging it back gets more expensive. The pain is not caused by merging - it is caused by waiting to merge.

    How to measure success: No branches older than 1 day. Merge conflict time drops to near zero. Development cycle time decreases.

    Resources: Trunk-Based Development - Merging Is Painful - Resistance to Trunk-Based Development


    Add a Test Before Fixing the Next Bug

    What: Before fixing any bug, write a failing automated test that reproduces it first. Then make the test pass. Apply this rule to every bug fixed from this point forward.

    Why: Bugs without tests get reintroduced. This builds test coverage organically where it matters most - in the failure modes your system has already demonstrated. It requires no upfront investment and delivers immediate value.

    How to measure success: Defect recurrence rate drops. The team can point to a test for every recent bug fix. Coverage grows on critical paths without a dedicated “write tests” project.

    Resources: Testing Fundamentals - Legacy System With No Tests - High Coverage but Tests Miss Defects


    Remove One Manual Step from Your Pipeline

    What: Map every step in your deployment process. Pick the one manual step that takes the most time or requires the most coordination. Automate it this sprint.

    Why: Manual steps create friction, variation, and key-person dependencies. Each one is a deployment delay that compounds over time. Removing one makes the next one easier to see and remove.

    How to measure success: That deployment step no longer requires a person. Deployment time decreases. The specific bottleneck person is no longer needed for that step.

    Resources: Phase 2: Pipeline - Single Path to Production - Release Manager Bottleneck


    Limit Work in Progress

    What: For one sprint, enforce a rule: each developer works on one story at a time to completion before starting another. No story is in progress unless someone is actively working on it right now.

    Why: WIP is the primary driver of long lead times. Every item sitting in-progress but not being worked on extends the queue for everything behind it. Reducing WIP is often the fastest path to faster delivery.

    How to measure success: Lead time for changes decreases within 2-3 sprints. Fewer stories carry over between sprints.

    Resources: Too Much WIP - Work in Progress Metric - Work Items Take Too Long


    Switch from Assigning Work to Pulling Work

    What: Stop pre-assigning stories to individuals at sprint planning. Instead, order the backlog by priority, leave all items unassigned, and have developers pull the top available item whenever they need work - swarming to help finish in-progress items before starting anything new.

    Why: Push-based assignment optimizes for keeping individuals busy, not for finishing work. It creates knowledge silos, hides bottlenecks, and makes code review feel like a distraction from “my stories.” Pull-based work makes bottlenecks visible, self-balances workloads, and aligns the whole team around completing the highest-priority item.

    How to measure success: Pre-assigned stories at sprint start drops to near zero. Work in progress decreases. Development cycle time shortens within 2-3 sprints as swarming increases. Knowledge of the codebase broadens across the team over time.

    Resources: Push-Based Work Assignment - Limiting WIP - Work Decomposition


    Write Your Definition of Deployable

    What: As a team, decide and document exactly what “ready to deploy to production” means. List every criterion. Automate as many as possible as pipeline gates.

    Why: Without a shared definition, “deployable” means whatever the most risk-averse person in the room decides at the moment. This creates deployment anxiety and inconsistency that blocks CD. A written, automated definition removes the ambiguity.

    How to measure success: Deployment decisions are consistent across team members. No deployment is blocked by a subjective manual checklist. The criteria are enforced in the pipeline, not in a meeting.

    Resources: Definition of Deployable - Working Agreements - Change Management Overhead